Project Description
Ticona uses advanced polymer technology to produce high performance plastic materials for a wide spectrum of applications – from children’s toys to automotive components. Dornan was contracted to undertake the electrical instrumentation and HVAC installation in relocating the plant from the Kelsterbach to the Höchst industrial site in Frankfurt.
- Remote control units and safety switches
- Emergency stops
- Cable and terminations
- Instrument junction boxes
- DCS panels, fibre optic and marshalling panels
- Free issue MV & LV
- Switchgear, transformers, busbars
- Transit frames and sockets
- Cable tray and ancillaries
- Lighting
- Earthing cable and terminations
- Electrical heat tracing
- Video system
- Electrical pre-commissioning testing of motors
- HVAC installation
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland