Verde, Victoria, London

Verde is a spectacular office-led redevelopment in the heart of London’s Victoria district. With a dramatic triple-height reception space, ten floors of Grade A offices and six staggered terraces overlooking the Royal Parks

LSE, CBR Building, London

Dornan successfully delivered the complete mechanical and electrical services for the Centre Building Redevelopment for the London School of Economics.

Heathrow Pier 7

Upgrading terminal infrastructure at an airport as busy as Heathrow requires smart scheduling to minimise downtime. Dornan successfully delivered this capability in installing all-new infrastructure services along Terminal 3’s 370m Pier 7.

Kent Station, Cork

As part of Iarnród Éireann’s preparations for the introduction of the much-publicised Mark 4 Trains to Ireland, a new service platform was built in Kent Station, adjacent to the existing maintenance facility. Dornan was awarded the mechanical services contract by John Sisk & Son.

Bracknell Town Centre Regeneration

Dornan has played a major role in transforming the centre of Bracknell, a post-war ‘New Town’ 65km west of London, into a vibrant retail and leisure destination.

Cork Air Traffic Control Tower

The new control tower to the west of the main runway completes the refurbishment of Cork Airport. Dornan completed mechanical and electrical works on this complex project.

Canary Wharf Station, London

Dornan was delighted to be appointed as an M&E contractor for such an innovative rail project. Canary Wharf Station on the new Crossrail network is 18m below water level, with five storeys of retail and office space above it,