Project Description
In 2012 Eli Lilly announced the construction of a new €330m plant at their site outside Kinsale in Cork. It’s a 244,000ft2 manufacturing facility on three floors, including clean-room process areas and ancillary functions.
- Complete commissioning of all process and HVAC systems, including calibrations of all level, flow, pressure and temperature instruments, and loop-checking of all other types of valves and instruments
- Calibration of analytical instrumentation
- Level strapping calibrations of approx 120 process vessels
- Agitator, fan and motor tests
- Vibration analysis of all motors >3kW
- approx 8000 loop checks and loop 2500 calibrations
- 13 AHUs with auxiliary equipment
- 16 process stainless steel exhaust systems
- Phoenix air control valves
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland