Project Description
This was a greenfield project requiring the modification and extension of a facility to construct a state of the art biopharma unit. The project had a challenging schedule, with design running very close to construction to ensure that the facility could be completed at the earliest opportunity and enable life-saving products to go to market as soon as possible. Dornan’s scope included electrical and instrumentation installation, testing, loop-checking, and calibration of all process instrumentation.
- Site-wide loop checking & calibration contract for over 4000 process instruments, extending into 2018
- Calibration of all process instrumentation
- Electrical and instrumentation installation fully integrated into the model by the Dornan BIM team
- Security and fire alarm systems
- UPS systems
- MV transformers, main and sub-main panels
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland