The Big Data Institute (BDI) is a spectacular biomedical research facility at Oxford University’s Old Road Campus, accommodating more than 500 scientists on its three storeys, and a dedicated data centre with capacity for 600 trillion computations per second. It’s the largest facility of its kind in the world.
- Design and installation of a combined heat and power system (CHP) which captures energy that would be lost in separate systems
- Installation of 1 kilometre of passive cooling and geothermal heating corridors using natural resources
- Installation of rooftop PV panels to power the BDI’s energy-efficient, suspended ‘Blade 2’ lighting strips
- Major research facility for Oxford University
- ‘Outstanding’ BREEAM rating
- 1km of passive cooling and heating corridors
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland