Dornan completed the mechanical and electrical fit-out of Block 2 of this new development adjacent to Dublin Airport. The building has some 95,000ft2 of office space over two storeys, with a basement car park.
Scope Of Mechanical Works
• Fit out of 4th floor and Landlord areas.
• Ventilation AC systems comprising of a Mitsubishi VRF System.
• 4No 100kw Gas Fired AHU and 4 Extract Air Handling Units.
• Installation of full rainwater pipe system.
• Fire hose reel protection system within basement and undercroft car park including FHR Booster Set and 4000l Water Tank.
• 40,000l Cold Water storage system including 5000l Mains Water Break.
• Tank serving Mains and Cold Water Supply.
• Cylon BMS Control System.
• 4.38m² Tubular Solar collector system and 500l Pre-heat Cylinder.
• 60kw Boiler serving all landlords heating and hot water services.
• Landlord Toilet Extract System.
• Radiator and Trench Heating System within Landlord Areas.
Scope of Electrical Works
• Fit out of 4th floor and landlord areas.
• LV Switchgear and associated Sub-Boards.
• Call Refuge System.
• Disable Toilet Alarm.
• Fire Detection System.
• Complete Internal and External Lighting Installation.
• Building Lightning Protection System.
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland