Heathrow Pier 7
blank_759_568
blank_759_568
blank_759_568
blank_759_568
blank_759_568

Project Description

 

Upgrading terminal infrastructure at an airport as busy as Heathrow requires smart scheduling to minimise downtime. Dornan successfully delivered this capability in installing all-new infrastructure services along Terminal 3’s 370m Pier 7.

 

Scope Of Work
  • 7 electrical distribution panels
  • 17 air handling units
  • Prefabricated chilled water pump room
Extraordinary solutions
  • 43 prefabricated pipework and containment modules
  • Bespoke, prefabricated pump room
  • Hydrosphere flushing rigs to minimise water consumption
OUR OFFICES
CORK
DUBLIN
LONDON
NETHERLANDS
BELGIUM
DENMARK
SWEDEN
GERMANY
SWITZERLAND
Address Information

10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63

Contact Us

"*" indicates required fields

Address Information

Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16

Contact Us

"*" indicates required fields

Address Information

114a Cromwell Road,
Kensington,
London SW7 4ES

Contact Us

"*" indicates required fields

Address Information

c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam

Phones
Contact Us

"*" indicates required fields

Address Information

Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium

Contact Us

"*" indicates required fields

Address Information

Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup

Contact Us

"*" indicates required fields

Address Information

Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden

Contact Us

"*" indicates required fields

Address Information

Wilbecker Strasse 18,
D-40699 Erkrath
Germany

Contact Us

"*" indicates required fields

Address Information

C/O J09 Lonza, Lonzastrasse 2,

CH-3930, Visp, Switzerland

Contact Us