Project Description
Upgrading terminal infrastructure at an airport as busy as Heathrow requires smart scheduling to minimise downtime. Dornan successfully delivered this capability in installing all-new infrastructure services along Terminal 3’s 370m Pier 7.
- 7 electrical distribution panels
- 17 air handling units
- Prefabricated chilled water pump room
- 43 prefabricated pipework and containment modules
- Bespoke, prefabricated pump room
- Hydrosphere flushing rigs to minimise water consumption
10 Eastgate Avenue,
Eastgate,
Little Island,
Cork T45 PC63
"*" indicates required fields
Unit A7
Centrepoint Business Park,
Oak Road,
Dublin 12
D12 YE 16
"*" indicates required fields
114a Cromwell Road,
Kensington,
London SW7 4ES
"*" indicates required fields
c/o Regus
Teleport Towers
Kingsfordweg 151
1043 GR Amsterdam
"*" indicates required fields
Antwerp
Uitbreidingstraat 84/3,
2600 Berchem,
Belgium
"*" indicates required fields
Regus Express
Copenhagen Airport
Terminal 3, 4th Floor
2770 Kastrup
"*" indicates required fields
Regus Norra Bantorget,
Olof Palmes gata 29,
Stockholm,
Sweden
"*" indicates required fields
Wilbecker Strasse 18,
D-40699 Erkrath
Germany
"*" indicates required fields
C/O J09 Lonza, Lonzastrasse 2,
CH-3930, Visp, Switzerland